Heger Dry Dock Consulting
Accident Investigations & Expert Testimony
Subject matter expertise for floating and graving drydock issues: accident root cause analysis, emergency repair design, salvage assistance, damaged-dock procedures and expert testimony.
Description
Heger Dry Dock acts as a subject matter expert on floating and graving drydock related issues.
Services
- Root cause analysis of drydock-related accidents
- Design of emergency repairs
- Assistance with salvage operations
- Procedures to dock or undock damaged vessels and/or docks
- Expert testimony
Investigations listed
- Failure of a pontoon deck with a Navy ship on dock: cause determined and an undocking method developed using the damaged dock
- Failure of transfer system anchor points: cause determined and repairs designed
- Sinking of a timber floating dock with a vessel aboard, and of a timber floating dock under tow
- Buckling of an LHA skeg while on blocks
More from Heger Dry Dock
- Graving Dock Caisson Gate Design
- Vessel Handling Trolley System Design
- Floating Dry Dock Design
- Vessel Transfer and Launch System Design
- Drydock Inspections & Certifications
- US Navy MIL-STD 1625 Facility Certification Reports
- Docking/Launch Calculations, Blocking Plans and Pumping Plans
- Floating Dock Mooring Design
- Dockmaster Training Courses & Seminars
- Shipyard Planning & Dock Selection
Featured services
All services →Engineering & Design
Graving Dock Caisson Gate Design
Design of replacement caisson gates and engineering support for graving (basin) drydocks, including naval shipyard gate replacements and basin dock recertification.
Rental / Leasing
Ship Leasing, Financing and Investment
ORIX invests in ships and charters them to Japanese and international shipping companies, and provides ship financing; in ship leasing since 1971 and a shipowner since the 1980s.
Engineering & Design
Engineering & Constructability Support
Underwater and marine engineering support with an Early Contractor Involvement approach to integrate construction means, methods and schedule into project design.